센테니얼 컬리지 report Tail Rotor Maint Prac
페이지 정보
작성일 19-07-21 17:00본문
Download : 센테니얼 컬리지 레포트 Tail Rotor Maint Prac.docx
순서
Project Group # 7 Tail Rotor Maintenance Practices
Project Identification
1. Bell 47G2 tail rotor: Disassembly the tail rotor, inspection, and rigging
2. Bell 206A drive shaft: Remove forward & after short shafts, inspection, and reinstall
Safety
1. Serious injury and equipment damage can occur due to electrical shorts or system actuation during maintenance. Always isolate effected systems or disconnect battery, disable systems and placard aircraft
2. All the caution and warning sections in the Maintenance Manual must be read and adhered to in order to prevent possible serious damage to the aircraft.
3. To avoid misconnection, any items removed must be clearly marked for location.
4. Hardware installation sequence and torque is critical, make certain that all technical publications are consulted for the correct parts and values
5. To wear safety shoes, safety glasses, and coverall
Equipment
Special tools:
Bell 206A: torque wrench
Bell 47G: two c-clamps, woo…(省略)
설명
레포트/기타




Download : 센테니얼 컬리지 레포트 Tail Rotor Maint Prac.docx( 60 )
센테니얼 컬리지 레포트 Tail Rotor Maint Prac , 센테니얼 컬리지 레포트 Tail Rotor Maint Prac기타레포트 , 센테니얼 컬리지 레포트 Tail Rotor Maint Prac
센테니얼,컬리지,레포트,Tail,Rotor,Maint,Prac,기타,레포트
센테니얼 컬리지 report Tail Rotor Maint Prac
센테니얼 컬리지 report Tail Rotor Maint Prac
다.